National Repository of Grey Literature 10 records found  Search took 0.01 seconds. 
Apartment Buildings in Hodonín Lípa - the Building Technological Planning.
Gabčová, Kateřina ; Štěrba, Martin (referee) ; Motyčka, Vít (advisor)
The technological project for the realization of the Apartment buildings Lípa in Hodonín includes a technical report, the preparation and construction site equipment, the time schedule and financial plan, the project budget, the technological prescription, the control and test plan, the health and safety plan, the plan of risks and prevention.
Business Center Orlova - building and technological project
Maléřová, Tereza ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
This Diploma thesis processes construction of a retail centre in Orlová Town, considering technology, finance and time aspects. Attention is focused mainly on the building process of the main premise – the structure of retail centre. Significant part of this dissertation consists of the technology study specifying readiness, proceedings and consequences of particular operations. In following chapters the main machine, substance and human resources and theire employment in place and time will be defined. More precise technology methods for chosen processes as well as quality standards in assesment and evaluation plan will be provided together with risk adjustment and risk management. In addition the Technical Report for equipment used in construction site will be submited, completed with sketches of construction-site equipment for chosen building stages. Financial and time schedule based on the technical and economy indicators will be provided for the complex of Retail centre, followed by precise time schedule. The impact of increased noise level caused by construction process will be evaluated in acoustic study and revelant precautions will be proposed and their effectivity verified.
The bridge construction in Droužkovice - project planning and management
Stloukal, Radim ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The subject of this thesis is technological projet of a bridge construction over R7 in the municipality Droužkovice. The presstressed superstructure is 63,20m long. As a part of this thesis is enclosed the technological report, site equipment, financial and time schedule of the main construction object, technological prescription of superstructure, the control and test plan, technological regulations.
Technological stage of realization structure of polyfunfcion building
Liška, Aleš ; Ing.Jitka Vlčková (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is technological stage of realization structure of polyfunfcion building in Velesin. The thesis deals with facility of the building site, project of machines, technological rules, plan of quality controls, timetable, item budget and work safety.
Production hall development center LISS - technological foundation stage
Maléřová, Tereza ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
This bachelor's thesis addresses the technological stage of the groundwork of the production hall and development centre LISS. The construction is based on bored piles of a wide diameter. Chosen constructions and technological equipment are based on shallow foundations. The main chapters of this thesis are technological regulations for groundwork, wide diameter bored pile and shallow monolithic foundations. Following chapters are about quality assurance and control, design of appropriate building machines and small machinery, time schedule and budget. It also deals with work safety and health protection and organisation of construction including draft of site equipment.
Technological stage of realization structure of polyfunfcion building
Liška, Aleš ; Ing.Jitka Vlčková (referee) ; Diaz, Yvetta (advisor)
The object of the bachelor thesis is technological stage of realization structure of polyfunfcion building in Velesin. The thesis deals with facility of the building site, project of machines, technological rules, plan of quality controls, timetable, item budget and work safety.
Business Center Orlova - building and technological project
Maléřová, Tereza ; Věrný, Luboš (referee) ; Vlčková, Jitka Laura (advisor)
This Diploma thesis processes construction of a retail centre in Orlová Town, considering technology, finance and time aspects. Attention is focused mainly on the building process of the main premise – the structure of retail centre. Significant part of this dissertation consists of the technology study specifying readiness, proceedings and consequences of particular operations. In following chapters the main machine, substance and human resources and theire employment in place and time will be defined. More precise technology methods for chosen processes as well as quality standards in assesment and evaluation plan will be provided together with risk adjustment and risk management. In addition the Technical Report for equipment used in construction site will be submited, completed with sketches of construction-site equipment for chosen building stages. Financial and time schedule based on the technical and economy indicators will be provided for the complex of Retail centre, followed by precise time schedule. The impact of increased noise level caused by construction process will be evaluated in acoustic study and revelant precautions will be proposed and their effectivity verified.
The bridge construction in Droužkovice - project planning and management
Stloukal, Radim ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The subject of this thesis is technological projet of a bridge construction over R7 in the municipality Droužkovice. The presstressed superstructure is 63,20m long. As a part of this thesis is enclosed the technological report, site equipment, financial and time schedule of the main construction object, technological prescription of superstructure, the control and test plan, technological regulations.
Apartment Buildings in Hodonín Lípa - the Building Technological Planning.
Gabčová, Kateřina ; Štěrba, Martin (referee) ; Motyčka, Vít (advisor)
The technological project for the realization of the Apartment buildings Lípa in Hodonín includes a technical report, the preparation and construction site equipment, the time schedule and financial plan, the project budget, the technological prescription, the control and test plan, the health and safety plan, the plan of risks and prevention.
Production hall development center LISS - technological foundation stage
Maléřová, Tereza ; Čech, David (referee) ; Vlčková, Jitka Laura (advisor)
This bachelor's thesis addresses the technological stage of the groundwork of the production hall and development centre LISS. The construction is based on bored piles of a wide diameter. Chosen constructions and technological equipment are based on shallow foundations. The main chapters of this thesis are technological regulations for groundwork, wide diameter bored pile and shallow monolithic foundations. Following chapters are about quality assurance and control, design of appropriate building machines and small machinery, time schedule and budget. It also deals with work safety and health protection and organisation of construction including draft of site equipment.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.